sfsa_s.gif (4934 bytes) amc.gif (6172 bytes)

afs.gif (3195 bytes)

A Design Study in Centrifugal Steel Castings - Accumulator Cylinder                                  

Mold Preparation

One or both ends of the mold have removable end caps which are held on with wedges or clamps. Removing the end cap allows removal of the casting from the mold.

  • A critical step in mold preparation is spray coating the interior wall of the steel mold with a ceramic slurry at a controlled thickness.  

  • The ceramic coating serves as a wetting agent that promotes the flow of the molten metal into the mold, controls the heat transfer during solidification, and acts as a parting coating for casting removal. 


Back


Next

20

 
Copyright 2004  by the Steel Founders' Society of America   All rights reserved. 
Address comments to: blairr@sfsa.org
Last Modified:April, 2004 by STG

arrow_top.gif (1191 bytes)
Page 1

In cooperation with
Spuncast, Inc.