Caterpillar Ramos Arizpe
Product Support and Logistics Division
Website: https://www.caterpillar.com/en/company/global-footprint/americas/mexico.html Email: lopez_fernando@cat.com |
Main office and Foundry: | Blvd. Industria de la Transformacion #3135 Parque Industrial Saltillo Ramos Arizpe Ramos Arizpe, Coahuila 25900 Mexico |
Mailing Address: | Blvd. Industria de la Transformacion #3135 Parque Industrial Saltillo Ramos Arizpe Ramos Arizpe, Coahuila 25900 Mexico |
Phone: | +52 844 4383000 |
Fax: | |
CAGE Code: |
PERSONNEL:
Fernando Lopez Villicana | Facility Manager |
Cesar Rivera Aspiazu | Manufacturing Engineering Manager |
Arturo Gamboa Valero | Operations Manager |
Victor Hernandez Martinez | EHS Manager |
Juan A. Orejon | Supply Chain Manager |
Martha Meneses | HR Manager |
Jose T. Vazquez | Business Resource Manager |
Liliana Gualajara | Student Manufacturing Engineering - Ramos Arizpe |
Isabel Briones Juarez | Leader of the Capability Building project of the Fusion area |
Melting/Refining Equipment: | Number of Units | Sizes (tons) | (Acid or Basic) | |||
---|---|---|---|---|---|---|
Type of Castings Produced:
Mining Equipment 50%; Construction Equipment 50%
Type of Alloys Produced:
Wear Resistant 100%
Mold Processes Used:
No-Bake 100%
Core Processes Used:
No-Bake 20%; Cold Box 20%
Welding:
SMAW; ASTM-A488
Test Facilities:
Mechanical Tests; Hardness; Spectrographic; Magnetic Particle; Liquid Penetrant; Ultrasonic; CMM; ASNT SNT-TC-1A
Other Facilities:
Heat Treat Equipment; Quenching Equipment; Pattern Shop
Use of product: | 100 %, for own use |
Casting Weight Range: | 50 lb - 600 lb |
Heaviest Section Thickness: | 12 in |
Lightest Section Thickness: | 1 in |
Monthly Capacity: | 750 tn |
Number of Employees: | 300 |