afs.gif (3195 bytes)

amc.gif (6172 bytes) sfsa_s.gif (4934 bytes)
A Design Study in Ductile Iron - Dotson Company Pivot Frame

The Production Process 

The plate frame is produced in 
a six step process.


1. The molten iron (2530-2570F)  is poured into the assembled sand mold and allowed to cool for 2-3 hours.

2. After cooling, the casting is removed from the sand mold by "shaking out" the sand.

3.  The riser is wedged off the casting.

4. The casting is Wheelabrator shot-basted to remove residual sand on the surface.

5.  Flash lines and the riser stub are ground off.

6.  The casting is finished painted, prior to machining.


Automated Metal Pouring at Dotson 


Back


Next

26

 
Copyright 2005 by the American Foundry Society. All rights reserved.
Address Comments to: jss@afsinc.org
Last Modified:September, 2005 by STG

arrow_top.gif (1191 bytes)
Page 1

In cooperation with
The Dotson Company.