afs.gif (3195 bytes)

amc.gif (6172 bytes) sfsa_s.gif (4934 bytes)
A Design Study in Ductile Iron - Dotson Company Pivot Frame

Option B -- Hub Up

In Option B, the heavy section hub is positioned  high in the mold and the riser (which also acts as a pouring inlet) is positioned directly over the hub.

  • The tapered riser  (6" tall and 3" diameter) has an exothermic sleeve to ensure that it remains molten.

This design ensures that the heavy hub section, which is the last section to solidify, will always be fed with molten metal by the attached riser and will solidify without shrinkage porosity.

The riser on the hub is the best approach for producing the center bore. 
Go on to the next design issue.


Back


Next

23

 
Copyright 2005 by the American Foundry Society. All rights reserved.
Address Comments to: jss@afsinc.org
Last Modified:September, 2005 by STG

arrow_top.gif (1191 bytes)
Page 1

In cooperation with
The Dotson Company.