sfsa_s.gif (4934 bytes)

amc.gif (6172 bytes) afs.gif (3195 bytes)
A Design Study in Steel - ME Elecmetal Crawler Track Shoe

V-Process Molding 

The next three steps in the V-process are:

5.  The vacuum is released from the pattern carrier and the  vacuum-constrained mold is stripped off  the pattern. 

6.  The two mold halves (cope and drag) are joined together to form the completed plastic lined mold cavity.  The vacuum is maintained in the flasks during molten metal pouring. 

 

7.  After metal pouring and cooling, the vacuum on the mold is released. 

The unbonded sand drops away, leaving a clean casting with zero draft and a 125-150 RMS surface finish. 


Back


Next

16

 
Copyright 2006  by the Steel Founders' Society of America   All rights reserved. 
Address comments to: blairr@sfsa.org
Last Modified:July, 2006 by STG

arrow_top.gif (1191 bytes)
Page 1

In cooperation with ME Elecmetal