With
the successful production of the hinge and bearing plates over the last five years, there
were two important lessons learned in this redesign and production effort.
- Concurrent engineering between the foundry engineer and
the buyer was critical for meeting quality, cost and schedule goals.
Close communication
between the system design engineers and the foundry engineers was the key to optimizing
the performance benefits and castability of the components.
|
|